**UPDATED 7/30 with the remaining photos**
Walking up a floor we come to three more rooms and a small storage room. There is one shared bathroom on this floor and it happens to be the only one in the house that has a shower so it will probably be our main bathroom until the others get fixed.
The room I'm most excited about on this floor is my craft room.
It's located directly above the master bedroom on the front side of the house. Through the door on the left is the shared bathroom.
The one and only shower in the house! That will definitely be getting changed. To the right of the shower (next to the sink) is another door that opens up into this bedroom:
And, back across the hall on the same side as the craft room, but in the back of the house, is the current laundry room. Hubs told me he's moving the laundry stuff down to the basement. I'm not too excited about this because that's a lot of hauling clothes up and down flights of stairs, but we'll see. I don't know what else to use this room for with the weird pole sticking in the middle of it.
So, that concludes the house tour. Stay tuned for photos once we start the updates. Right now we're in the process of finalizing the closing and hoping that all goes well. As of now, it's looking like it will be the end of August, but we'll see!
Wednesday, July 30, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Thanks for taking the time to comment!
I love being able to interact with my readers, so please leave some way for me to contact you to respond if you're interested.